Cookie Consent by Free Privacy Policy Generator website

Login


Forgotton Password? | Register

Register

Register


25m x 25m Spaciotempo Semi-Permanent Building - West Yorkshire

Description

This building was erected in 2006 and moved into storage in 2021 (located in Leeds)
It was supplied by Spaciotempo as a hire which was purchased at the end of.

Used at the Milton Keynes National Bowl for vehicle auctions for several years.

Below is the specification as supplied

Warehouse

Frame Designed and manufactured in accordance with the following Eurocodes;
BS EN 1991-1-3:2003 – General Actions (Snow Loads)
BS EN 1991-1-4:2005 – General Actions (Wind Actions)
BS EN 1993-1-1:2005 – Eurocode 3 – Design of Steel Structures
BS EN 1993-1-1:2007 – Eurocode 9 – Design of Aluminium Structures

Roofs and Gables

White PVC coated Polyester flame retardant fabric:
Thermo roof and gables – Traffic White – RAL 9016
(Inflated envelope / 240v Pump - continuous supply)

Walling

Light grey steel reinforced extruded profile in hard UPVC.
Retardant to: Class ‘1’ when tested to BS476 Part 7 1997 and DIN 4102 Part 15 and 16

Doors 3 x Single Personnel Exit Doors
(Height 2.1m x Width 1.06m)
positions as per original install

2 x Manual Roller Shutter Doors
(Height 4.3m x Width 4.6m) positions as per original install

Guttering

50 linear metres including downpipes (i.e. 25mtrs to each side)

plans by manufacturer in the images.


Delivery notes

Currently stored in two 40ft shipping containers in Leeds.

Collection only - will advise container details to any shipping enquiries

Contact notes

David Pheby

dave.pheby@stadiauk.com

Price: £20000 +VAT
Ref#: 6A2F0CC8F1A5
Brand: Spaciotempo (5)


If this item is sold please tell us!

Report listing as sold

Occasionally, listings can remain on our website even when sold, if the owner forgets to tell us.
 
If you have been in contact with the owner and know this item is sold, then please use the form below to tell us.